Beginning in 2004, Hatzel & Buehler has completed several projects at American Electric Power’s Gavin Station. These projects range from a complete control system upgrade on the Unit 2 turbine to lighting replacement throughout the site. Hatzel & Buehler completed the retrofit of the general lighting in both of the operating units.
Hatzel & Buehler maintains an ongoing customer relationship with American Electric Power.